✨ New Arrivals Just Dropped!Explore
HomeStore

Coldwater Strong Long Leader Float Triple Rig 5/0 Shrimp Fly Kit

Product image 1

Coldwater Strong Long Leader Float Triple Rig 5/0 Shrimp Fly Kit

Coldwater Strong Long Leader Float Triple Rig 5/0 Shrimp Fly Kit

Coldwater Strong – Long Leader Float Triple Rig 5/0 Shrimp Fly Kit

  • Includes non-compressible float
  • Comes with a 3 shrimp fly leader rig
  • Includes 5 × 5/0 shrimp flies in multiple colors
  • Features 35 ft of 120 lb mono line for lead setup
  • Includes a Cuban hand reel for storing mono line
  • Built with high-quality terminal tackle
  • All connections are secured using pneumatic press crimps
  • Designed as a tangle-free, plug-and-play system — just attach mainline, add lead, and fish
$10.41

Original: $29.74

-65%
Coldwater Strong Long Leader Float Triple Rig 5/0 Shrimp Fly Kit

$29.74

$10.41

Product Information

Shipping & Returns

Description

Coldwater Strong – Long Leader Float Triple Rig 5/0 Shrimp Fly Kit

  • Includes non-compressible float
  • Comes with a 3 shrimp fly leader rig
  • Includes 5 × 5/0 shrimp flies in multiple colors
  • Features 35 ft of 120 lb mono line for lead setup
  • Includes a Cuban hand reel for storing mono line
  • Built with high-quality terminal tackle
  • All connections are secured using pneumatic press crimps
  • Designed as a tangle-free, plug-and-play system — just attach mainline, add lead, and fish